• TZM Molybdenum Alloy Rod Bar
  • TZM Molybdenum Alloy Rod Bar
  • TZM Molybdenum Alloy Rod Bar
  • TZM Molybdenum Alloy Rod Bar
  • video

TZM Molybdenum Alloy Rod Bar

  • China origion
  • 15-30 days
  • 2t/ month
high melting point high strength high elastic modulus low linear expansion coefficient low vapor pressure good conductivity and heat conductivity corrosion resistance high temperature mechanical

TZM alloy rod is made by powder metallurgy way. Mix molybdenum powder with IH2 powder, ZRH2 powder and graphite powder in proportion, forming by cold isostatic pressing and then sinter them at high temperature under protective atmosphere. TZM alloy is also called Titanium-Zirconium-Molybdenunm alloy, 0.50% titanium,0.08% zirconium,0.02% C, rest molybdenum.

TZM alloy has high melting point, high strength, high elastic modulus, low linear expansion coefficient, low vapor pressure, good conductivity and thermal conductivity, strong corrosion resistance advantages and good mechanical properties at high temperature, so it can be widely used in many fields.

TZM alloy (mo-zr-ti alloy) has a high melting point, so it can be used for black or Non-ferrous metal die casting die materials and seamless stainless steel tube as the TZM piercing plug.


  • How will you guarantee your quality?

    At first we will make sure that we got all customer's requirements clear. Then place order to production department and inspection department. Each production process will test themselves if everything is right. And before shipping, all products will pass the packing department only after inspection department inspected that the products meet customer's requirements. If not, the products will go back to production department for fixing or remaking.

  • What's the lead time? Do you accept emergency order?

    For production, normally our lead time is 20-30 days. But according to different products and different quantity, it changes a little. If your order is emergency, contact with us, we will find a way out to solve your problem. For shipping, normally we ship by express and air. Express takes about 7-10 days, and air 3-5 days. And if customer requires by sea, we will ship by sea, it takes normally 40-50 days.

  • what if the products have quality issue?

    All our products are shipped after strict inspection and safety packing. Inspection by each production process makes sure the quality is good. And the inspection department will inspect again carefully to make sure everything is right. But if quality issue really occurs, we are sorry, and we will be responsible. To fix the products or remake them, we will make everything right.

  • what's the payment term?

    In order to keep our healthy cooperation, our payment term normally is 50% payment in advance, balance paid before shipping. And if customer needs, we will calculate the shipping cost for your reference.

Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)